Blog

Three – in – one fiber splitting box

Product description: FTTH outdoor wall-mounted optical splitter box is used for wiring connection between optical cable and optical communication equipment. It is drawn out by optical fiber jumper through the adapter in the wiring box Product description: FTTH outdoor wall-mounted optical splitter box is used for wiring connection between optical cable and optical communication equipment. […]

Three – in – one fiber splitting box Read More »

blog4(1)

Oklo and Vertiv announced a collaboration to provide power and cooling solutions for hyperscale and colocation data centers in the United States

Innovative Clean Energy Partnership Addresses Critical Data Center Power and Cooling Challenges Santa Clara, CA [July 22, 2025] – Oklo Inc. (NYSE: OKLO), an advanced nuclear technology company, and Vertiv (NYSE: VRT), a global leader in critical digital infrastructure, today announced a collaboration agreement focusing on developing advanced power and thermal management solutions tailored for

Oklo and Vertiv announced a collaboration to provide power and cooling solutions for hyperscale and colocation data centers in the United States Read More »

blog3(1)

Vertiv leads the computing power era with its full-chain capabilities, maintaining its leading position in the three major markets of precision air conditioning, UPS, and micro-modules.

Vertiv has consistently ranked first in China’s precision air conditioning, UPS, and micro-module markets for many years. This is not only due to its product leadership but also its superior system capabilities. Vertiv has become the industry’s leading benchmark by leveraging its full-chain system capabilities and single-point advantages. Vertiv has been ranked No. 1 in

Vertiv leads the computing power era with its full-chain capabilities, maintaining its leading position in the three major markets of precision air conditioning, UPS, and micro-modules. Read More »

blog2(1)

Vertiv releases cutting-edge technology guide and new AI products

A single ChatGPT inference task takes a GPU only 1 second, but a CPU takes 32 hours—this is not just a generational gap in computing power, but a watershed moment for critical infrastructure. As the number of parameters in large models grows exponentially, traditional data centers are facing core challenges such as heat dissipation bottlenecks,

Vertiv releases cutting-edge technology guide and new AI products Read More »

6502(1)
Shopping Cart